Fifty Six Sigma slides in one calm blue look, from the bell curve and the DMAIC phases to Pareto charts, control charts, belt roles and lean wastes. Change the colours and fonts, put in your own process and figures, and download them as PowerPoint.
This six sigma template pack gives you 50 slides for running and presenting an improvement project: sigma levels and defects per million, the five DMAIC phases, the project charter, SIPOC, voice of the customer, process capability, root cause analysis and the control plan. As a lean six sigma template it also covers the eight wastes, 5S, the value stream, kaizen and takt time.
One neutral sample project runs through the slides, from 6,210 to 233 defects per million in 26 weeks, so the figures agree from the first slide to the last. The charts are real charts you edit by their data, and every text and shape stays editable in the editor and in PowerPoint.
Your Own Six Sigma Deck In This Look
Describe the process you want to improve, and the AI builds a deck of your own in this blue Six Sigma style, with your defects, your targets and your words.
Every slide with its words. Open one in the editor to change it 1:1.
1 · Bell Curve CoverThe title slide of the pack: the normal curve of a process with its centre and its limits from minus three to plus three sigma. The curve is a real chart, so its values can be changed. Use it to open a deck on Six Sigma, DMAIC or Lean Six Sigma.
2 · DMAIC Chevron RowThe five DMAIC phases as one row of chevrons, each with its letter, its name and what it achieves. Use it to introduce the method or to show where a project stands. Replace the short texts with the aims of your own project.
3 · Sigma Level StairsThe standard sigma table as a staircase: every step down is one sigma level higher and far fewer defects per million opportunities. Use it to explain what a sigma level means in practice. The figures are the standard values with the long-term shift of 1.5 sigma.
4 · Bell Curve With Sigma BracketsA normal curve above three nested brackets that show how many results fall within one, two and three sigma of the mean. Use it to explain spread before you talk about capability. The curve is a real chart.
5 · Why Six Sigma With PhotoA large photo beside the three reasons to adopt Six Sigma, each with an icon tile. Use it early in a deck to win support for a programme. Replace the three benefits with those that matter most in your organisation.
6 · DPMO Formula In TilesThe formula for defects per million opportunities as one row of tiles, with a worked sample under it. Use it to teach the calculation or to show how your own baseline was reached. Replace the counts with those of your process.
7 · One-Page Project CharterA project charter on one page: the problem and the goal in two wide cards, and scope, team, timing and benefit in four field cards. Use it in the Define phase to get the Champion to sign off. Replace the sample figures with those of your project.
8 · SIPOC ColumnsThe SIPOC as five columns under five letters on one line, the process column highlighted, with the start and end of the process at the foot. Use it in the Define phase to agree what the project covers. Fill the columns with your own process.
9 · Voice Of The Customer With PhotoThree things customers say, each in a speech bubble and each turned into the need behind it, beside a photo. Use it to bring real customer language into the Define phase. Replace the statements with those from your survey or complaints.
10 · CTQ TreeA critical-to-quality tree that runs from one customer need through three drivers to three measurable requirements. Use it to turn a vague wish into limits a team can measure. Replace the drivers and limits with your own.
11 · Data Collection PlanThe data collection plan as four questions on one line: what is measured, how, by whom and when. Use it at the start of the Measure phase so that everybody collects the same data in the same way. Replace the answers with your own plan.
12 · Gage R&R With PhotoA measurement system study: a real bar chart of where the variation comes from, the verdict in one key figure and a photo of an inspection. Use it to prove that your data can be trusted before you analyse it. Replace the shares with those of your own study.
13 · Capability HistogramA histogram of the process as a real bar chart between its lower and upper specification limits, with Cp and Cpk in two cards. Use it in the Measure phase to show the baseline. Replace the bars and the limits with your own data.
14 · Process Capability ScaleOne horizontal scale of process capability, from Cp 1.00 at three sigma to Cp 2.00 at six sigma, with the step of the project highlighted. Use it to show what a change in capability means in defects. Move the two markers to your own baseline and target.
15 · Rolled Throughput Yield ChainFive process steps with the yield of each and the running product along one line, ending in the rolled throughput yield. Use it to show how small losses add up across a process. Replace the steps and yields with your own.
16 · Pareto Chart Of DefectsA Pareto chart as a real bar chart: six defect types sorted by count, with the cumulative share in a row under the bars and the vital few highlighted. Use it in the Analyse phase to decide where to look first. Replace the types and counts with your own.
17 · Five Whys StairThe five whys as a stair of bars, each one step further in, until the last bar names the root cause. Use it in a workshop to get past the first symptom. Replace the answers with those of your own problem.
18 · Scatter Plot With Trend LineA scatter plot drawn with single dots that can be moved, a trend line and the correlation in one key figure. Use it in the Analyse phase to prove that an input really drives the output. Move the dots to your own data.
19 · Root Causes On A PhotoA full photo under a navy overlay with the three root causes the team has verified, each on a glass card. Use it to close the Analyse phase and to win agreement before improving anything. Replace the three causes with your own.
20 · Hypothesis Test With P-ValueA hypothesis test in three parts: the null and the alternative hypothesis, a p-value scale with its 0.05 line and the decision. Use it in the Analyse phase to show that a difference is real and not chance. Replace the statements and the p-value with your own.
21 · Box Plots By ShiftThree box plots drawn with shapes on one shared scale, one for each shift, each with its median. Use it to compare the spread of groups in the Analyse phase. Resize the boxes and whiskers to your own quartiles.
22 · FMEA Risk Priority ChartA failure mode and effects analysis in one view: a real bar chart of the risk priority numbers, and the formula of severity, occurrence and detection worked for the top risk. Use it to decide which failure to tackle first. Replace the modes and scores with your own.
23 · Ranked Solutions With ScoresFour candidate solutions ranked by a weighted score of impact, effort and risk, each with a score bar, the chosen ones marked. Use it in the Improve phase to show why the team picked what it picked. Replace the solutions and scores with your own.
24 · Design Of Experiments LinesThe main effects of a designed experiment as a real line chart: how far the result moves when each factor goes from its low to its high setting. Use it in the Improve phase to find the best setting. Replace the factors and results with your own.
25 · Mistake-Proofing With PhotoFour poka-yoke devices as a list with icon tiles, beside a photo of the work. Use it in the Improve phase to show how an error is made impossible rather than merely checked for. Replace the devices with your own.
26 · Before And After Bell CurvesTwo bell curves in one real line chart: the wide process before the project and the narrow one after it, with the sigma and the defects of each. Use it to show the effect of an improvement at a glance. Replace the curves and figures with your own.
27 · Six-Week Pilot With Photo BandA photo band over the six weeks of the Improve phase, each week a marker on one line with its step. Use it to plan or report a pilot before the full rollout. Replace the steps with your own.
28 · Control Chart With LimitsA control chart as a real line chart: twelve samples around the centre line, between the upper and the lower control limit, shown as the deviation from the target. Use it in the Control phase to prove that the process is stable. Replace the samples with your own.
29 · Control Plan In RowsThe control plan as four rows: each measure with its limit, how often it is checked and who owns it. Use it to hand a finished project over without losing the gain. Replace the measures with your own.
30 · Reaction Plan FlowA reaction plan as a small flow: a signal on the chart, the decision whether it has a special cause, and the two ways back to the standard. Use it in the Control phase so that everyone knows what to do when a point goes out. Replace the steps with your own.
31 · Four Control Chart SignalsFour small real line charts, each showing one pattern that tells a team the process has gone out of control. Use it to train the people who read the charts every day. Replace the sample lines with examples from your own process.
32 · Handover Checklist With PhotoA large photo beside the five things that must be done before a Black Belt hands a process back to its owner. Use it at the end of the Control phase as the final check. Replace the items with your own checklist.
33 · Cost Of Poor Quality BarsThe cost of poor quality before and after the project as two bars of a real chart, with the saving, the project cost and the payback in three key figures. Use it to report the financial result to the sponsor. Replace the figures with those confirmed by your finance partner.
34 · Belt Hierarchy PyramidThe belt roles as a stepped pyramid, from the few at the top to the many at its base, each with its job at the side. Use it to explain who does what in a Six Sigma programme. Adapt the roles to your own organisation.
35 · Project Roles With PortraitsFour round portraits on one line, each with a role of the project and its duty. Use it to introduce the team of a project at its kick-off. Replace the photos with your own team and keep the role names.
36 · Belt Training StairsFour rising steps, one for each belt, with the length of its training and what it prepares for. Use it to plan a training path or to explain a certification. Replace the lengths with those of your own programme.
37 · Eight Lean Wastes GridThe eight wastes of lean in two rows of four, their initials spelling DOWNTIME so that a team can remember them. Use it to train a team or to start a waste walk. Add an example from your own process to each.
38 · 5S Hexagons With PhotoThe five steps of 5S as a row of hexagons with icons, beside a slim photo of a tidy workplace. Use it to launch a workplace organisation drive. Replace the short texts with the rules of your area.
39 · Value Stream Time LadderA value stream in one view: five process steps, under each the time it waits and the time it is worked on, and the totals at the foot. Use it to show how little of the lead time adds value. Replace the steps and days with your own.
40 · Lean And Six Sigma CirclesTwo overlapping circles over a photo under a navy overlay: Lean removes waste, Six Sigma removes variation, and where they meet stands Lean Six Sigma. Use it to explain why the two methods belong together. Change the words in the circles to fit your programme.
41 · Five-Day Kaizen EventA kaizen event day by day: a photo strip, five day pills on one line and under each a card with its icon and its task. Use it to plan a focused improvement week. Replace the tasks with your own agenda.
42 · Takt Time Balance ChartA line-balance chart: a real bar chart of the cycle time of each station with the takt time drawn across it. Use it to find the stations that hold the process back. Replace the stations and times with your own.
43 · DMAIC And DMADV TracksThe two roadmaps of Six Sigma as one track that splits: Define, Measure and Analyse are shared, then DMAIC improves an existing process and DMADV designs a new one. Use it to decide which route a project should take.
44 · Project Selection FunnelA real funnel chart from all project ideas down to the few approved, with the three criteria that decide. Use it to explain how projects are chosen in a Six Sigma programme. Replace the counts and criteria with your own.
45 · Five Tollgates With PhotoFive diamond tollgates on one line, one at the end of each DMAIC phase, each with what must be proven, beside a slim photo. Use it to agree how a project is reviewed. Replace the proofs with those your Champion asks for.
46 · DMAIC Project ScheduleThe five DMAIC phases as bands on a scale of months and weeks, from January to June 2027. Use it to plan a project or to show where it stands. Drag the bands to the weeks of your own project.
47 · Deployment Roadmap With PhotoA vertical roadmap of how Six Sigma spreads through an organisation over four years, beside a large photo. Use it to present a programme to the executive team. Replace the years and stages with your own.
48 · Project Results DashboardA one-page results dashboard: four key figures over a real bar chart of the sigma level at the end of each phase. Use it to report a finished project to the Champion. Replace the figures with your own.
49 · Toolkit By DMAIC PhaseThe standard tools of Six Sigma in five columns, one for each DMAIC phase, each headed by a pill. Use it as a reference page or to agree which tools a project will use. Add or remove tools as you need.
50 · Closing With Next StepsThe closing slide: a photo, three concrete next steps and the step from four to five sigma as the goal. Use it to end a deck with a clear call to action. Replace the steps with your own.
What Is Inside The Pack
The bell curve and the sigma table, DMAIC as chevrons, a schedule and a toolkit, a project charter, SIPOC, voice of the customer and a CTQ tree, Gage R&R, capability, rolled throughput yield, Pareto, five whys, scatter and box plots, a hypothesis test, FMEA, design of experiments, mistake-proofing, control charts, a control plan and a reaction plan, the cost of poor quality, the belt hierarchy, the eight lean wastes, 5S, a value stream, kaizen, takt time and tollgate reviews. Every text, shape and chart stays editable.
How To Use This Six Sigma Template
01
Pick Your Slides
Choose the slides of the six sigma template that your meeting needs: the DMAIC overview for a kick-off, one tool for a workshop, the results for a tollgate review.
02
Set Your Colours
Use the colour and font bar to match your brand; every slide follows at once.
03
Enter Your Project
Replace the sample defects, limits and savings with the data, roles and dates of your own process.
04
Present Or Download
Present straight from the browser or download the slides as a PPTX file for PowerPoint.
What A Six Sigma Presentation Should Show
Start with the problem in figures: the current defect rate, the sigma level it stands for and what poor quality costs each year. A clear charter then states the goal, the scope, the team and the timing, so that the Champion knows what is being signed off.
Follow the DMAIC order from there. Show how the data was measured, which root causes were verified, what was changed and how the gain is held. Close with the result against the goal and the control plan that keeps it in place.
Tips For Clear Six Sigma Slides
Keep one process measure and one set of limits throughout the deck, so that a figure on a control chart means the same as on the capability slide. State the unit on every chart and say which period it covers.
Show one finding per slide. A Pareto chart should point to the vital few, a control chart to whether the process is stable, and a results slide to the saving. Leave the statistical detail for the backup slides and the questions.
Frequently Asked Questions
Is this Six Sigma template free?
Yes. You can view and edit every slide of this six sigma template for free, and download the deck as PPTX with a free account.
Is this also a Lean Six Sigma template?
Yes. Next to DMAIC and the statistical tools it covers lean: the eight wastes on slide 37, 5S on slide 38, the value stream on slide 39, Lean and Six Sigma together on slide 40, a kaizen event on slide 41 and takt time on slide 42.
Does it open in PowerPoint?
Yes. Download the slides as a PPTX file and open them in PowerPoint; the texts, shapes, pictures and charts stay editable there.
Which slides follow the DMAIC phases?
Slide 2 gives the overview and slide 46 the schedule. Define runs from the charter on slide 7 to the CTQ tree on slide 10, Measure from slide 11 to 15, Analyse from slide 16 to 22, Improve from slide 23 to 27 and Control from slide 28 to 32.
Are the sigma levels on the slides correct?
Yes. Slide 3 uses the standard table with the long-term shift of 1.5 sigma: 66,807 defects per million at 3 sigma, 6,210 at 4 sigma, 233 at 5 sigma and 3.4 at 6 sigma.
Can I edit the charts?
Yes. The bell curves, the Pareto chart on slide 16, the control chart on slide 28 and the other charts are real charts, so you change them by their data. In the six sigma template they stay editable after the PPTX download too.
Can I change the colours and fonts?
Yes. The colour and font bar changes every slide at once, and you can still adjust single shapes in the editor.
Can the AI build a deck for my process?
Yes. Fill With AI takes your topic and builds a new deck of your own in this look, with your process, figures and words.
Try ExpertSlides AI For Free — The Ultimate AI Presentation Maker
Describe any topic or upload a document, and ExpertSlides designs and writes the whole deck — editable in the browser and as a PowerPoint file.